What Auckland clients say
“Sam and the team at Chambers Consultants are absolute professionals and provide excellent service and communication. They helped us recently with a complex pre purchase inspection and saved us from making a big mistake!”
Jeremy M., Google review
“The team was professional, reliable, and delivered high-quality results on time. Very responsive and easy to work with—I highly recommend them for any geotechnical needs.”
Hossein G., Google review
“Good reliable Consultant Engineers, technically sound.”
Shahid A., Google review
Read all reviews on Google · Geotechnical engineers in Auckland · What a geotechnical report costs
Frequently asked questions
What is the difference between a site investigation and a geotechnical report?
The site investigation is the field and laboratory work: the desktop study, the boreholes, test pits, hand augers, Scala penetrometer or CPT probes, groundwater observations and any laboratory testing. The geotechnical report is the engineering document produced from that data, which interprets the ground model and gives design parameters, bearing capacities, settlement estimates and recommendations. A consent application needs the report, but the report is only as good as the investigation behind it.
How deep does a site investigation need to go?
Deep enough to cover the zone of influence of the proposed structure and to prove the founding material. For a single dwelling on shallow foundations that is often 3 to 5 metres, or to refusal. For piled foundations, multi-level buildings or retaining structures the investigation must extend below the pile toe or the failure surface being assessed, which can be 10 to 20 metres or more. On sloping sites the depth is driven by the depth of any potential slip surface rather than by the building alone.
How long does a site investigation take?
Field work on a typical residential site is usually one day. Allowing for utility location, machine access and booking, a reasonable expectation from instruction to reporting is two to three weeks. Where laboratory testing is required, where the site needs specialist access, or where council has asked for a specific scope, this can extend. Sites with restricted access or requiring traffic management should be programmed with more contingency.